Current Projects

Hot-In-Place Recycling, TCH 1 Walhachin to Tobiano, Hwy 97 Bonaparte River Bridge to Hwy 99 Intersection (74.5 Lane KM)

Area 1: Highway 1 approximately 23 kilometres east of Cache Creek (LKI Segment 0920 from KM 23.00 to KM 50.63); Area 2: Highway 97 approximately 6 kilometres north of Cache Creek (LKI Segment 1130 from KM 6.10 to KM 10.97).

EPS testing for Asphalt from their mobile lab. Asphalt Mix Designs .Quality Management ( QC Plan and QC Testing)